Steel and Metal Service Centre Coil Packing Process: Tilting, Eye-Through Wrapping and Stacking

Executive summary This clip shows our coil packing lines for steel and metal service centres. Coils are tilted, wrapped through the eye and stacked, with narrow coils travelling on conveyors between stations. Service centres pack many sizes a day, so the process has to change over quickly between coil sizes.

Table of Contents

What the clip shows

Step What you see
Tilting A tilter turns the coil
Wrapping A ring wraps the coil through the eye
Conveying Narrow coils move between stations
Stacking Coils stack at the line end
Lines Several of our lines in the workshop

The packing process

  1. Receive. Coils arrive from the slitter or cut-to-length line.
  2. Tilt. The tilter turns each coil as needed.
  3. Strap. Straps hold the wraps, where specified.
  4. Wrap. Film covers the coil through the eye.
  5. Stack. Coils stack on pallets for dispatch.

Changeovers

Worked example (illustrative).

Item Value
Size changes per shift (illustrative) 6
Changeover by hand (illustrative) 15 min
Changeover from recipe (illustrative) 2 min
Time saved per shift, 6 × (15 − 2) 78 min

What we set per centre

Setting Depends on
Recipes Coil sizes run
Tilter Coil weight
Wrapping Layers
Stacking Stack pattern

Selection checklist

  • Coil size range.
  • Size changes per shift.
  • Coils per hour.
  • Strapping and wrapping needs.
  • Stack pattern.
  • Layout.

Safety

  • Keep clear of moving stations.
  • Stay outside the fence while the line runs.
  • Lock out before clearing a jam.
  • For CE markets, the machine is designed to ISO 12100 and EN 415-10.

Engineering FAQ

Q: What is the process? A: Receive, tilt, strap, wrap and stack.

Q: Why fast changeovers? A: Service centres pack many coil sizes a day.

Q: How much time do recipes save? A: 78 min per shift in the worked example.

Q: Can it take slitter and cut-to-length output? A: Yes, both can feed the line.

Q: Is strapping included? A: Where specified.

Q: Which standards apply? A: For CE markets, ISO 12100 and EN 415-10.

Next step

We match a service centre packing line in three steps:

  1. Submit your layout drawing with coil sizes, changes per shift and coils per hour, to info@fhopepack.com.
  2. Receive a proposal within 48 hours with the machine data and layout.
  3. Book a site survey so we confirm the slitter exit.

Sources

  • Machine content: FHOPE engineering team, 2026-10-10
  • Clip: the video on YouTube
  • Changeovers: our worked example, illustrative values
  • Standards scope: ISO 12100:2010; EN 415-10:2014
  • Proposal timing: approved house CTA (proposal within 48 hours)

Last reviewed: 2026-10-10