真是信息:Line Configuration: The number and type of stations, such as wrapping, labeling, and stacking, affect total cost.
Coil Specifications: Coil diameter, width, and weight determine the required machine size and capacity.
Automation Level: Manual, semi-automatic, and fully automatic options carry different investment levels.
Handling Requirements: Coil feeding, flipping, and transfer equipment add to the line scope.
Site Conditions: Installation, layout, and utility preparation affect the total project cost.
Quote Planning Support: Provides configuration guidance so customers can match budget to production needs.
