Santrauka A bundle of square steel tubes runs through our automatic strapping station, with timber blocks set at the strap positions. The strapping head in the arch clamps the bundle and bands it at one position. The conveyor advances and the next band goes on, so each strap holds the tubes and a timber block together. Below we explain why the blocks go in at strapping, the cycle, our strap data and how to size the band.
Turinys
- Ką daro mašina
- Kodėl medinius blokus reikia rišti į ryšulį
- Dirželio ir galvos duomenys
- Juostos ilgis su bloku
- Atrankos kontrolinis sąrašas
- Saugumas
- Inžinerijos DUK
- Kitas žingsnis
- Susijęs skaitymas
- Šaltiniai
Ką daro mašina
The strapping cycle runs step by step:
- Padavimas. The square tube bundle advances on the conveyor and is centred; the timber block is already at the strap position, and the strap reel stands beside the arch.
- Spaustuvas. The strapping head descends over the middle of the bundle and clamps it, stabilizing the tube matrix and the block before strap application.
- Dirželis. The strap is fed round bundle and block, tensioned and sealed with a double-notch joint from the seal magazine; the conveyor then indexes forward and the next band goes on behind the first.
- Atleiskite. After the last band the head lifts and the bundle moves on to the outfeed.
Machine sequencing, tension profiles, and fault diagnostics are managed through the floor-mounted industrial control cabinet featuring an integrated touch-panel HMI.
Kodėl medinius blokus reikia rišti į ryšulį
Square and rectangular hollow sections pack flat-on-flat. Without spacers there is no gap for forks or slings, and stacked bundles press tube on tube. Strapping a timber block in at each strap position fixes that at the source:
- Kėlimo erdvė. The block raises the bundle so forklift forks or slings go under it without hitting the tubes or deforming the bottom walls.
- Krovimas. Blokai laiko viršuje esančio ryšulio, o ne vamzdžių sienelių, apkrovą.
- Nėra palaidų atraminių medžiagų. The block is held by the same steel band as the tubes, so it cannot vibrate loose or shift in transit.
- Vienas perdavimas. Sujungimas į ryšulius, blokų dėjimas ir surišimas atliekami vienoje stotyje, be jokio papildomo tvarkymo. plieninių vamzdžių paketų pakavimo linija ši stotis stovi po ryšulių formavimo.
Dirželio ir galvos duomenys
Our heavy-duty steel tube bundle strapping machine operates to the following engineering specifications:
| Punktas | Paskelbta vertė |
|---|---|
| Dirželių medžiaga | Šaltai valcuotas mažai anglies turintis plienas, mėlynintas ir vaškuotas |
| Juostos storis | 0.8 mm arba 1.0 mm |
| Sandarinimo plotis | 25 mm arba 32 mm |
| Dirželio įtempimas | 7,000–18,000 N |
| Padavimas ir surinkimas | 2–3 m/s |
| Įtempimo greitis | 6 m / min |
| Hidraulinis slėgis | 100 barų (darbinis slėgis 80–90 barų) |
| Dirželių skaičius viename pakete | 5 į 7 |
The heavy-duty strapping head utilizes a mechanical magazine holding approximately 180 seals to deliver double-notched interlocking joints. The dedicated hydraulic power unit incorporates a water-cooled heat exchanger to preserve oil viscosity and clamping consistency across continuous multi-shift operations.
Juostos ilgis su bloku
Jei ryšulis yra kvadratinis arba stačiakampis ir surištas ant medinio bloko, juosta eina aplink ryšulį ir bloką. Juostos ilgis ≈ 2 × (W + H + h), kur W yra ryšulio plotis, H – ryšulio aukštis, o h – bloko aukštis.
Praktinis pavyzdys (iliustracinis). 400 mm pločio ir 300 mm aukščio ryšulėlis ant 100 mm bloko: 2 × (400 + 300 + 100) = 1,600 mm juostos vienai juostai prieš sandarinimo juostos persidengimą. Su 5 juostomis tai yra apie 8 m juostos vienam ryšuliui.
Atrankos kontrolinis sąrašas
To configure an automatic strapping system tailored to your mill throughput, compile the following operational parameters:
- Tube cross-section dimensions (OD or square profile), wall thickness range, and finished cut lengths.
- Tube bundle geometry (width, height), piece count per package, and maximum total bundle weight.
- Timber block cross-section (width × height), length, and source supplier tolerances.
- Block placement methodology: manual positioning by the operator or integration with an automatic timber hopper-feeder.
- Required number of straps per bundle and target strap centerline pitch dimensions.
- Existing packaging consumables inventory: strap thickness (0.8 mm vs. 1.0 mm) and seal width (25 mm vs. 32 mm).
- Post-line handling protocol: crane rigging sling engagement, side-loading forklifts, and target vertical stacking heights.
Saugumas
The head clamps with force and the strap is tensioned up to 18,000 N. While the line runs, the strapping zone is closed off and timber blocks are placed only with the head parked. Hydraulic inspection and maintenance are carried out with the system stopped and pressure released.
For CE-regulated installations, machine compliance is engineered against ISO 12100:2010 for risk assessment and risk reduction principles, and EN 415-10:2014 for safety requirements governing general packaging machinery.
Inžinerijos DUK
Q: Why put the timber block in at strapping? A: Encircling the tubes and the timber block within the same high-tension steel band forms a unified, rigid package. The bundle exits the finishing line with permanent forklift clearances and zero loose dunnage that could dislodge in transit.
Q: Is the block inserted by the machine? A: In our standard equipment layout, the timber runner is placed onto the conveyor or bundle station prior to head closure. An automated multi-magazine timber block feeding and positioning unit can be integrated directly upstream; specify block dimensions during line planning.
K: Kaip stipriai įtemptas dirželis? A: The hydraulic strapping head adjusts steplessly across a tension envelope of 7,000–18,000 N. This allows operators to achieve maximum bundle compaction without collapsing thin-walled hollow sections or crushing soft dunnage lumber.
Q: How many bands go on a bundle? A: Standard steel mill packages typically receive 5 to 7 bands along their length, spaced evenly as the indexing conveyor steps the bundle through the arch.
Q: How long is each band? A: Net band perimeter equals approximately 2 × (W + H + h). For a 400 × 300 mm bundle secured with a 100 mm timber block, each band measures roughly 1,600 mm before seal overlap.
Q: What strap and hydraulic supply does the head use? A: The head uses cold-rolled, low-carbon blued and waxed steel strap in 0.8 mm or 1.0 mm thicknesses, matched with 25 mm or 32 mm seals. The dedicated hydraulic system is rated for 100 bar, running at typical operating working pressures of 80–90 bar with integrated water cooling.
K: Kokie standartai taikomi? A: For CE compliance, our engineering adheres to ISO 12100 for holistic mechanical risk mitigation and EN 415-10 for packaging machine safety design.
Kitas žingsnis
We engineer and deliver integrated tube bundling and strapping stations through a structured three-step protocol:
- Pateikite savo išdėstymo brėžinį including tube profiles, bundle dimensions, timber block sizes, and required bands per bundle to info@fhopepack.com.
- Gaukite pasiūlymą per 48 valandas complete with general arrangement layout drawings, cycle time analyses, and consumable specifications.
- Užsisakykite objekto apžiūrą with our engineering team to verify floor loading capacities, conveyor centerline elevations, and safety perimeter boundaries.
Susijęs skaitymas
- Plieninių vamzdžių pluošto surišimas judančia galvute
- Automatinis plieninių vamzdžių surišimo ir rišimo sprendimas
- Automatinė gipso kartono surišimo mašina su medienos padavimu ir kraštų apsauga
- Plieninių vamzdžių pluoštų surišimo mašina
Šaltiniai
- Mašina veikianti: vaizdo įrašas „YouTube“ platformoje
- Diržo, sandarinimo, įtempimo, greičio, hidraulikos ir juostų skaičiaus ryšulyje duomenys: Plieninių vamzdžių pluoštų surišimo mašina
- Juostos ilgis: mūsų apdorota geometrija iš aukščiau pateiktų verčių
- Standartų taikymo sritis: ISO 12100:2010; EN 415-10: 2014
- Pasiūlymo pateikimo laikas: patvirtintas įmonės CTA (pasiūlymas pateiktas per 48 valandas)
Paskutinį kartą peržiūrėta: 2026-10-29