Linka pro dělení, navíjení a stohování svitků: Dopravníkové nárazníky, které udržují řezačku v chodu

> **Shrnutí**
> This clip shows one of our slit coil lines in our workshop. A teal upender turns each coil, an orbital ring wraps it eye-through on a green conveyor line, and a yellow hooded gantry stacks the wrapped coils on a long outfeed conveyor. Conveyor sections between the stations act as buffers, so a short stop at one station does not stop the slitter upstream.

Obsah

Co klip ukazuje

| Step | What you see |
|---|---|
| Workshop | Several of our coil lines in assembly |
| Upending | A teal upender with a large rotary disc turns the coil |
| Wrapping | An orbital ring wraps the coil eye-through while an operator watches |
| Stacking | A yellow hooded gantry picks and stacks wrapped coils |
| Outfeed | Stacks travel along a long conveyor |

Proč mezi stanicemi vznikají nárazníky

- **Short stops are absorbed.** A film change or strap jam fills the buffer instead of stopping the line.
- **Stations run at their own pace.** Each one takes the next coil when ready.
- **The slitter keeps cutting.** Coils keep leaving the slitter while the buffer has room.
- **Fewer restarts.** Less stop-start means steadier cycle times.

Délka vyrovnávací paměti

**Worked example (illustrative).**

| Item | Value |
|---|---|
| Slitter output (illustrative) | 1 coil per 60 s |
| Stop to absorb, film change (illustrative) | 5 min |
| Coils arriving during the stop, 5 × 60 ÷ 60 | 5 coils |
| Conveyor length per coil position (illustrative) | 1,500 mm |
| Buffer length needed, 5 × 1,500 | 7,500 mm |

Délka na pozici cívky zahrnuje samotnou cívku a mezeru mezi cívkami.

Co nastavujeme na řádek

| Setting | Depends on |
|---|---|
| Buffer length | Slitter output and longest stop |
| Upender | Coil weight and position |
| Wrapping | Film layers and overlap |
| Stacking | Coils per stack |

Kontrolní seznam pro výběr

- [ ] Coil OD, ID, width and weight.
- [ ] Slitter output in coils per hour.
- [ ] Longest stop to absorb.
- [ ] Floor length for buffers.
- [ ] Wrapping and strapping needed.
- [ ] Stack pattern.

Bezpečnost

- Keep clear of the upender, ring and gantry while they move.
- Stay outside the fenced gantry area.
- Lock out before clearing a jam.
- For CE markets, the machine is designed to ISO 12100 and EN 415-10.

Často kladené otázky k inženýrství

Q: Why add buffers?
A: So a short stop at one station does not stop the slitter.

Q: How long should a buffer be?
A: Coils arriving during the longest stop times the conveyor length per coil; 7,500 mm in the worked example.

Q: Does the line upend coils?
A: Yes, a teal upender turns each coil before wrapping, as in the clip.

Q: What does the gantry do?
A: It picks wrapped coils and builds stacks on the outfeed.

Q: Can buffers be added to an existing line?
A: Often yes, if there is floor length.

Otázka: Které normy platí?
A: For CE markets, ISO 12100 and EN 415-10.

Další krok

Balicí linku pro štěrbinové svitky připravujeme ve třech krocích:

1. **Submit your layout drawing** with coil sizes, slitter output and floor layout, to **info@fhopepack.com**.
2. **Receive a proposal within 48 hours** with the machine data and layout.
3. **Book a site survey** so we confirm the slitter exit and floor length.

- [Slit Coil Tilting, Eye-Through Wrapping and Stacking Line](https://www.fhopepack.com/videos/mechanical-load-and-tension-analysis-in-integrated-tilting-strapping-and-stretch-wrapping-systems-for-high-precision-slit-steel-coil/)
- [Narrow Steel Coil Packing Line](https://www.fhopepack.com/videos/preventing-telescoping-surface-scratches-and-edge-buckling-engineering-solutions-for-tilting-strapping-and-wrapping-delicate-steel-coils/)
- [Automatic Steel Coil Stacking and Palletizing Gantry](https://www.fhopepack.com/videos/eliminating-bottlenecks-why-your-steel-processing-center-needs-an-automated-coil-stacking-line/)
- [Slit coil packing line](https://www.fhopepack.com/Automatic-Coil-Packing-Line/slit-coil-packing.html)

Zdroje

- Machine content: FHOPE engineering team, 2026-10-10
- Clip: [the video on YouTube](https://www.youtube.com/watch?v=iEgxg0ho--s)
- Buffer length: our worked example, illustrative values
- Standards scope: ISO 12100:2010; [EN 415-10:2014](https://www.nen.nl/en/nen-en-415-10-2014-en-191845)
- Proposal timing: approved house CTA (proposal within 48 hours)

Naposledy zkontrolováno: 10. 10. 2026