Yönetici Özeti
Automatic steel tube bundle strapping here keeps the bundle still on a rack and moves the strapping head along it, placing straps at set positions. The head travels across the bundle while the tubes stay in place, so a long bundle does not have to run through the line. Bundle size, strap and strap spacing are confirmed per project.
İçindekiler
- Why strap steel tube bundles
- Makine ne yapar?
- Bundle rack, moving head and strap feed
- Döngü ve kontrol
- Görüntülerde neler gösteriliyor?
- Tipik yapılandırma
- Seçim kontrol listesi
- Çalıştırma ve güvenlik
- Mühendislik SSS
- Sonraki adım
- Ilgili okuma
- Kaynaklar ve standartlar
Why strap steel tube bundles
Steel tubes are shipped and stored in bundles, and a loose bundle lets the tubes shift and scratch against each other in transit. Strapping holds the bundle together and makes it easy to lift and handle.
When the strapping head moves along a bundle that stays still, the line does not need to push a long bundle through a fixed head. This keeps the strapping step compact and the bundle easy to control. Bundle length and strap are confirmed per project.
Makine ne yapar?
The machine is an automatic steel tube bundle strapping line. The tube bundle is laid on a rack, and a movable strapping head travels along the bundle and applies straps at set positions while the bundle remains in place.
When the straps are set, the bundle stays intact on the rack for lifting or the next step in the line. Bundle size and the number of straps are confirmed per project.
Bundle rack, moving head and strap feed
The line is built around three working parts. A long rack holds the tubes as a horizontal bundle. A movable head and guide travel along the rack over the bundle, and a ring-shaped guide around the bundle carries the strap feed to the strapping position.
A control box sits on the line beside the head. The head travel keeps the bundle stationary, which is the point of the moving-head layout. Rack length and head travel are confirmed per project.
Döngü ve kontrol
The cycle runs in steps. The tube bundle is laid on the rack, the head travels along the bundle to each strapping position, and the strap is applied and tensioned around the bundle at each position. The head then returns, and the strapped bundle is lifted off the rack.
The cycle is started from the control box on the line, and the machine holds the bundle in place while the head moves. Cycle control and the panel layout are confirmed per project.
Görüntülerde neler gösteriliyor?
Our footage shows steel tubes laid in a bundle on the rack. A yellow guide travels across the top of the bundle, and the ring-shaped head and the control box sit on the line behind the bundle. The bundle stays in place while the head moves along it. It is a general demonstration, so your bundle size, strap and strap spacing are confirmed with us per project.
Tipik yapılandırma
Aşağıdaki rakamlar sayısal değerler yerine işlevsel tasarım sınırlarını listelemektedir ve her proje için teyit edilmiştir.
| Parametre | Tipik aralık, proje bazında teyit edilmiştir. |
|---|---|
| Yük | steel tube bundles laid on the rack |
| baş | strapping head travels along the stationary bundle |
| Kayış | strap applied and tensioned at set positions |
| Başlangıç Kılavuzu | ring-shaped guide carries the strap around the bundle |
| Control | control box on the line beside the head |
| Elektrik beslemesi | Proje bazında seçilebilecek şekilde, 380 V üç fazlı 50 Hz veya hafif makineler için 220 V tek fazlı elektrik sağlanabilir. |
Seçim kontrol listesi
| Soru | Proje bazında onaylayın. |
|---|---|
| demet | tube diameter, length and tubes per bundle |
| Kayış | strap type, width, tension and strap count |
| baş | head travel and strap spacing |
| Düzen | rack length and line layout |
| Control | panel konumu ve hat çevresindeki koruma |
| Elektrik beslemesi | yerinde voltaj, faz ve frekans |
Çalıştırma ve güvenlik
Lay the tube bundle on the rack, start the cycle, and let the head travel along the bundle and set the straps. Keep clear of the moving head and the strap feed while the machine runs, and do not stand between the bundle and the head during the cycle.
Routine checks cover the head travel, the strap feed and the guide ring, per the machine manual. Confirm the bundle is seated on the rack before each cycle.
Mühendislik SSS
Q: Does the head move while the bundle stays still? A: Yes, the strapping head travels along the bundle when the cycle runs, and the bundle stays on the rack; this is the moving-head layout for long bundles.
Q: How is the strap applied? A: The ring-shaped guide holds the strap around the bundle at each position, and the strap is drawn through the head before it moves to the next strap point.
Q: Why use a moving strapping head instead of indexing the bundle? A: A long bundle does not have to be pushed through a fixed head, so the strapping step stays compact and the bundle stays easy to control.
Q: Do we load the tubes one by one? A: The bundle is laid on the rack as a group, and tubes are fed in through the rack opening; feeding can be arranged to match your tube line, per project.
Q: What does it suit? A: Bundles of steel tubes and pipes that need a tight strap pack when they are stored, lifted or transported.
Sonraki adım
- Email us at info@fhopepack.com with your bundle size and tube length.
- We send a bundle strapping proposal within 48 hours.
- We confirm the strap, head travel and electrical supply for your line.
Ilgili okuma
- Hareketli bağlama başlığıyla çelik boru demetinin otomatik olarak bağlanması nasıl yapılır?
- Çelik için hortum boru sarma makinesi ve bobin paketleme makineleri
- Plastik Boru ve Tüp Ambalajı: Kapsamlı Kılavuz
- FHOPE paketleme makineleri ürün yelpazesi
Kaynaklar ve standartlar
- ISO 12100:2010 Makine güvenliği, tasarım ve risk değerlendirmesi için genel prensipler
- EN 415-10:2014 Ambalaj makinelerinin güvenliği, genel gereksinimler
- EN ISO 13849-1:2023 Makine güvenliği, kontrol sistemlerinin güvenlikle ilgili parçaları
FHOPE automatic steel tube bundle strapping demonstration video. Reviewed as a general demonstration; bundle size, strap and strap spacing confirmed per project.
Son gözden geçirme tarihi: 23.03.2026





