Balicí linka pro řezané svitkové plechy na místě: zakončení, oční páskování, balení a stohování palet v centru pro řezané svitkové plechy

> **Shrnutí**
> This clip is real site footage of our slit coil packing line at a slit coil center in Mexico. Coils come off the slitter eye-horizontal, a downender lays them flat on yellow roller conveyors, a strapping head bands each coil through the eye, a wrapping station covers it with film, and a gantry stacks the coils onto pallets. Site staff run and check the line during the run.

Obsah

Co klip ukazuje

| Krok | Co vidíte |
|---|---|
| Line | The blue and yellow line in the customer hall |
| Downending | A downender lays each coil flat onto the conveyor |
| Strapping | A strapping head drops through the eye and bands the coil |
| Wrapping | A wrapping station covers the coil with film |
| Stacking | A gantry stacks coils onto wooden pallets |

Site checks before handover

| Check | What we confirm |
|---|---|
| Coil range | Smallest and largest coils run without adjustment problems |
| Cycle | Line keeps pace with the slitter |
| Strap and film | Strap tension and film overlap meet the spec |
| Stacking | Stack pattern and pallet position are correct |
| Safety | Fences, interlocks and emergency stops work |

Cívky na paletě

**Pracovní příklad (ilustrativní).**

| Položka | Hodnota |
|---|---|
| Coil width (illustrative) | 200 mm |
| Stack height limit (illustrative) | 1,000 mm |
| Coils per stack, 1,000 ÷ 200 | 5 coils |
| Stacks per pallet (illustrative) | 1 |
| Coil weight (illustrative) | 400 kg |
| Pallet load, 5 × 400 | 2,000 kg |

Co nastavujeme pro každou stránku

| Nastavení | Záleží na |
|---|---|
| Downender | Coil weight and slitter exit height |
| Strap | PET or steel strap, straps per coil |
| Film | Layers and overlap |
| Stacking | Coils per stack and pallet size |

Kontrolní seznam pro výběr

- [ ] Vnější průměr, vnitřní průměr, šířka a hmotnost cívky.
- [ ] Slitter exit position.
- [ ] Počet popruhů na cívku.
- [ ] Vrstvy filmu.
- [ ] Pallet size and load limit.
- [ ] Cívek za hodinu.

Bezpečnost

- Keep clear of the downender, strapping head and gantry while they move.
- Stay outside fenced areas.
- Před odstraněním zaseknutí zablokujte.
- Pro trhy CE je stroj navržen dle norem ISO 12100 a EN 415-10.

Často kladené otázky k inženýrství

Q: What does the line do on site?
A: It downends, straps, wraps and stacks slit coils onto pallets.

Q: What is checked before handover?
A: Coil range, cycle, strap and film, stacking and safety.

Q: How many coils per pallet?
A: Stack height divided by coil width; 5 coils in the worked example.

Q: Is the downender needed?
A: Yes, when coils leave the slitter eye-horizontal and must lie flat.

Q: Can the line use steel strap?
A: Yes, with edge protectors where needed.

Otázka: Které normy platí?
A: Pro trhy CE platí normy ISO 12100 a EN 415-10.

Další krok

Balicí linku pro štěrbinové svitky připravujeme ve třech krocích:

1. **Submit your layout drawing** with coil sizes, weights, slitter layout and coils per hour, to **info@fhopepack.com**.
2. **Do 48 hodin obdržíte nabídku** s údaji o stroji a rozvržením.
3. **Book a site survey** so we confirm the slitter exit.

- [Slit Coil Upending, Wrapping and Stacking Line](https://www.fhopepack.com/videos/inside-the-mill-modernizing-slit-steel-coil-handling-strapping-and-stacking-for-zero-downtime-output/)
- [Narrow Coil Strapping, Wrapping and Gantry Stacking Line](https://www.fhopepack.com/videos/from-strapping-to-stacking-how-an-automated-steel-coil-packaging-line-transforms-shop-floor-productivity-2/)
- [Steel Coil Packing Line Hot Commissioning](https://www.fhopepack.com/videos/steel-coil-packing-line-with-factory-full-load-hot-commissioning/)
- [Linka na balení řezaných svitků](https://www.fhopepack.com/Automatic-Coil-Packing-Line/slit-coil-packing.html)

Zdroje

- Obsah stroje: Inženýrský tým FHOPE, 10. 10. 2026
- Clip: [the video on YouTube](https://www.youtube.com/watch?v=Tq5AgJeApoo)
- Coils per pallet: our worked example, illustrative values
- Rozsah norem: ISO 12100:2010; [EN 415-10:2014](https://www.nen.nl/en/nen-en-415-10-2014-cs-191845)
- Načasování návrhu: schválený CTA (návrh do 48 hodin)

Naposledy zkontrolováno: 10. 10. 2026