{"id":17410,"date":"2026-08-24T17:27:11","date_gmt":"2026-08-24T09:27:11","guid":{"rendered":"https:\/\/www.fhopepack.com\/zh\/?p=17410"},"modified":"2026-08-24T17:27:11","modified_gmt":"2026-08-24T09:27:11","slug":"full-automatic-cable-rewinding-strapping-packing-machines-2","status":"publish","type":"post","link":"https:\/\/www.fhopepack.com\/zh\/full-automatic-cable-rewinding-strapping-packing-machines-2\/","title":{"rendered":"Full-automatic cable rewinding strapping packing machines"},"content":{"rendered":"<blockquote>\n<p><strong>Verification caveat:<\/strong> No buyer inquiry text, supplier quotation, specification sheet, or regulatory document was available during the preparation of this guide. Every parameter labeled <strong>buyer-stated<\/strong> reflects the draft&#8217;s representation of the original request and must be confirmed in writing. Every delivery time, warranty period, and budget figure labeled <strong>illustrative<\/strong> is a planning assumption, not a supplier commitment. Treat this document as an RFQ preparation tool, not as a substitute for a written supplier proposal.<\/p>\n<\/blockquote>\n<h2>\ud83d\udee0\ufe0f Standard Overview<\/h2>\n<iframe width=\"100%\" height=\"420\" src=\"https:\/\/www.youtube.com\/embed\/GC8OV2-gTIU?rel=0\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture\" allowfullscreen><\/iframe>\n<p><strong>A warehouse-scale cable rewinding, strapping, and packing machine must take pay-off from a master drum up to 2,000 kg, measure and cut flexible and power cables up to 240 mm\u00b2 into 50 m or 100 m coils, then strap and wrap each coil automatically \u2014 within a buyer-stated EUR 20,000\u201330,000 budget that remains unverified until a written quotation is issued.<\/strong><\/p>\n<p>This guide is structured as an RFQ preparation document for one specific requirement: a full-automatic cable rewinding, strapping, and packing machine for warehouse operation, not for continuous cable manufacturing. It defines the parameters to request, the standards to require, and the written evidence a buyer should collect before committing capital.<\/p>\n<h3>Operational parameters (buyer-stated, not yet confirmed)<\/h3>\n<table>\n<thead>\n<tr>\n<th>Parameter<\/th>\n<th>Buyer-stated value<\/th>\n<th>Verification status<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Cable types<\/td>\n<td>Flexible and power cables up to <strong>240 mm\u00b2<\/strong><\/td>\n<td>Unverified; confirm max cross-section and conductor class (see IEC 60228)<\/td>\n<\/tr>\n<tr>\n<td>Master drum weight<\/td>\n<td>Up to <strong>2,000 kg<\/strong><\/td>\n<td>Unverified; confirm flange diameter, traverse width, and barrel diameter<\/td>\n<\/tr>\n<tr>\n<td>Finished coil length<\/td>\n<td><strong>50 m or 100 m<\/strong><\/td>\n<td>Unverified; confirm coil ID, OD, width, and maximum coil weight<\/td>\n<\/tr>\n<tr>\n<td>Monthly output<\/td>\n<td>Approximately <strong>10,000 finished coils<\/strong><\/td>\n<td>Unverified; confirm operating shifts and peak demand<\/td>\n<\/tr>\n<tr>\n<td>Daily workload<\/td>\n<td>Fewer than <strong>10 master drums per day<\/strong><\/td>\n<td>Unverified; confirm whether this is steady or seasonal<\/td>\n<\/tr>\n<tr>\n<td>Additional task<\/td>\n<td>Occasional drum-to-drum rewinding<\/td>\n<td>Unverified; confirm which drum sizes<\/td>\n<\/tr>\n<tr>\n<td>Target budget<\/td>\n<td><strong>EUR 20,000\u201330,000<\/strong><\/td>\n<td>Buyer-stated target; not a supplier quotation<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong>Key data gap:<\/strong> finished coil inner diameter, outer diameter, width, and maximum weight are absent from the supplied materials. Coil geometry determines the measuring unit, coil former, strap head, and wrapping module. A quotation that omits these values is incomplete.<\/p>\n<h3>Plain-language definitions<\/h3>\n<table>\n<thead>\n<tr>\n<th>Term<\/th>\n<th>Definition<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><strong>Pay-off<\/strong><\/td>\n<td>A stand or de-reeler that holds the master drum and releases cable under controlled tension.<\/td>\n<\/tr>\n<tr>\n<td><strong>Extrusion line<\/strong><\/td>\n<td>A continuous production system in which molten plastic is forced through a die to apply insulation or a sheath over a conductor; not part of a warehouse rewinding operation.<\/td>\n<\/tr>\n<tr>\n<td><strong>Accumulator<\/strong><\/td>\n<td>A storage buffer that holds a length of cable so a downstream machine can pause for coil change-over without stopping the upstream line.<\/td>\n<\/tr>\n<tr>\n<td><strong>Turntable<\/strong><\/td>\n<td>A rotating platform that positions heavy drums or coils for strapping, wrapping, or discharge.<\/td>\n<\/tr>\n<tr>\n<td><strong>PP woven sheet<\/strong><\/td>\n<td>A fabric woven from polypropylene tape, similar to bulk-bag material, used to wrap cable coils for heavy-duty protection.<\/td>\n<\/tr>\n<tr>\n<td><strong>EXW (Ex Works)<\/strong><\/td>\n<td>An Incoterm under which the supplier places the machine at its own factory; the buyer bears all transport, customs, and insurance cost from that point onward.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3>Regulatory and quality standards to require from the supplier<\/h3>\n<table>\n<thead>\n<tr>\n<th>Standard or directive<\/th>\n<th>Relevance to this purchase<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><strong>Machinery Directive 2006\/42\/EC<\/strong><\/td>\n<td>Mandatory CE marking for machinery sold in the EEA; the supplier must provide a Declaration of Conformity and CE mark on the nameplate.<\/td>\n<\/tr>\n<tr>\n<td><strong>ISO 12100:2010<\/strong><\/td>\n<td>Safety-of-machinery framework for risk assessment and risk reduction; evidence that pinch points, rotating parts, and cable-tension hazards were addressed.<\/td>\n<\/tr>\n<tr>\n<td><strong>IEC 60204-1:2016<\/strong><\/td>\n<td>Electrical equipment safety on machines; governs control circuits, emergency stops, and wiring practice.<\/td>\n<\/tr>\n<tr>\n<td><strong>EN 415-8:2008<\/strong><\/td>\n<td>Safety of packaging machines \u2014 strapping machines; applies directly to the strapping module.<\/td>\n<\/tr>\n<tr>\n<td><strong>IEC 60228<\/strong><\/td>\n<td>Classification of conductor stranding; confirm the machine can handle the conductor classes typical of 240 mm\u00b2 flexible and power cable.<\/td>\n<\/tr>\n<tr>\n<td><strong>ISO 9001:2015<\/strong><\/td>\n<td>Supplier quality management; request a certificate to assess process consistency.<\/td>\n<\/tr>\n<tr>\n<td><strong>ISO 780:2015<\/strong><\/td>\n<td>Packaging handling pictograms; relevant for marking crates for shipment to Israel.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>\ud83c\udfd7\ufe0f Key Changes<\/h2>\n<p><strong>The primary requirement shift is operating volume: fewer than 10 master drums per day and roughly 10,000 finished coils per month define a warehouse job-shop profile, not continuous cable manufacturing, so a compact offline coil line is more appropriate than an online system integrated with an extrusion line.<\/strong><\/p>\n<p>Most supplier demonstration videos show high-speed inline systems attached to cable extrusion plants. Those systems assume continuous material flow, rapid coil change-over, and a dedicated operator team. At the buyer-stated volume \u2014 under 10 master drums per day \u2014 the machine will idle for extended periods. A high-speed continuous line would consume capital with no return during idle time.<\/p>\n<h3>Solution A: Offline full-automatic coil line<\/h3>\n<p>A compact offline line typically sequences: master drum pay-off \u2192 measuring and length counting \u2192 cutting \u2192 coiling \u2192 strapping \u2192 shrinking\/wrapping \u2192 discharge conveyor. The vendor&#8217;s Solution 1 follows this arrangement, with two-strap binding and optional one-side strapping.<\/p>\n<h3>Solution B: Online full-automatic coil and wrapping machine<\/h3>\n<p>The vendor&#8217;s Solution 2 is a full-automatic cable coiling and wrapping machine using PVC film, configurable as an online unit connected after the cable extrusion line. That configuration adds pay-off, accumulator, tension station, coiling-wrapping machine, and outgoing conveyor. The accumulator exists to buffer material flow so the extrusion line never stops during coil change-over \u2014 a benefit only when the coiling machine must keep pace with continuous 24-hour extrusion.<\/p>\n<h3>Material difference: PVC film versus PP woven sheet<\/h3>\n<table>\n<thead>\n<tr>\n<th>Property<\/th>\n<th>PVC film (Solution 2)<\/th>\n<th>PP woven sheet<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Visual inspection<\/td>\n<td>Transparent; coil visible<\/td>\n<td>Opaque; coil hidden<\/td>\n<\/tr>\n<tr>\n<td>Abrasion resistance<\/td>\n<td>Lower; suited to protective film wrap<\/td>\n<td>Higher; suited to rough handling<\/td>\n<\/tr>\n<tr>\n<td>Weight per coil<\/td>\n<td>Low<\/td>\n<td>Higher<\/td>\n<\/tr>\n<tr>\n<td>Typical use<\/td>\n<td>Compact coil wrapping<\/td>\n<td>Heavy-duty outer cover, export packing<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3>Decision basis for this buyer<\/h3>\n<p>The buyer-stated profile \u2014 fewer than 10 master drums per day, ~10,000 coils\/month, EUR 20,000\u201330,000 budget \u2014 points to Solution A (offline) as the economically rational starting point. The online configuration should be quoted only if the buyer anticipates future integration with an extrusion line, which the supplied materials do not indicate.<\/p>\n<h2>\ud83d\udcc8 Business Impact<\/h2>\n<p><strong>The financial case depends on eliminating manual binding and wrapping for roughly 10,000 coils per month, not on machine speed; at the buyer-stated EUR 20,000\u201330,000 budget \u2014 unverified until itemized in a written quotation \u2014 a compact automatic line can be cost-effective, while a high-speed continuous system would sit idle at fewer than 10 drums per day.<\/strong><\/p>\n<p>The economic logic has three parts:<\/p>\n<ol>\n<li>\n<p><strong>Labor cost per coil is the main driver.<\/strong> Ten thousand manual wraps per month is a recurring labor expense that an automatic machine replaces. The exact savings depend on local labor rates, shift structure, and the cycle time of the proposed machine.<\/p>\n<\/li>\n<li>\n<p><strong>Idle time is a capital risk.<\/strong> At fewer than 10 master drums per day, the machine operates in short batches. A simpler offline line with a lower purchase price and lower maintenance burden minimizes the risk of paying for capacity that is not used.<\/p>\n<\/li>\n<li>\n<p><strong>Heavy cable creates mechanical limits.<\/strong> Cable up to 240 mm\u00b2 produces heavier finished coils. This determines the coiling-spindle torque, the turntable payload rating, the discharge conveyor capacity, and the strap-tension capability. All four values must appear in the quotation.<\/p>\n<\/li>\n<\/ol>\n<h3>Cost and performance parameters: source status<\/h3>\n<table>\n<thead>\n<tr>\n<th>Parameter<\/th>\n<th>Value<\/th>\n<th>Source status<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>EUR 20,000\u201330,000<\/td>\n<td>Budget target<\/td>\n<td>Buyer-stated; no quotation seen<\/td>\n<\/tr>\n<tr>\n<td>10,000 coils\/month<\/td>\n<td>Output target<\/td>\n<td>Buyer-stated; no production study seen<\/td>\n<\/tr>\n<tr>\n<td>240 mm\u00b2 max cable<\/td>\n<td>Cable range<\/td>\n<td>Buyer-stated; no cable specification sheet seen<\/td>\n<\/tr>\n<tr>\n<td>Production speed<\/td>\n<td><strong>Not specified<\/strong><\/td>\n<td>Must be requested per cable size; do not accept a single speed figure for all cable cross-sections<\/td>\n<\/tr>\n<tr>\n<td>Measuring accuracy<\/td>\n<td><strong>Not specified<\/strong><\/td>\n<td>Must be requested; identify the measurement method (encoder, contact counter, or laser) and its stated repeatability<\/td>\n<\/tr>\n<tr>\n<td>Warranty<\/td>\n<td><strong>Not specified<\/strong><\/td>\n<td>Illustrative 12-month assumption; requires written confirmation<\/td>\n<\/tr>\n<tr>\n<td>Lead time<\/td>\n<td><strong>Not specified<\/strong><\/td>\n<td>Illustrative 6\u201312 week assumption; requires written confirmation<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<blockquote>\n<p><strong>Decision rule:<\/strong> Any proposal that quotes a price but omits production speed, measuring accuracy, electrical supply, compressed-air data, warranty, and lead time should be returned to the supplier as incomplete.<\/p>\n<\/blockquote>\n<h2>\ud83d\udee1\ufe0f Procurement Verification Actions<\/h2>\n<p><strong>Before any purchase commitment, the buyer must obtain a written quotation listing the recommended model, full technical specification, EXW price, lead time, warranty, electrical and compressed-air data, and demonstration videos showing the machine running power cables up to 240 mm\u00b2; any proposal omitting these items should be returned for clarification.<\/strong><\/p>\n<h3>Regulatory compliance obligations<\/h3>\n<p>A machine imported to Israel does not automatically require CE marking. However, if the supplier offers the machine as CE-compliant, the buyer should hold the supplier to the documentation required by <strong>Machinery Directive 2006\/42\/EC<\/strong>:<\/p>\n<ul>\n<li>\n<p>A Declaration of Conformity signed by the manufacturer.<\/p>\n<\/li>\n<li>\n<p>A CE mark on the machine nameplate.<\/p>\n<\/li>\n<li>\n<p>A risk-assessment file prepared per <strong>ISO 12100:2010<\/strong>.<\/p>\n<\/li>\n<li>\n<p>Electrical equipment conforming to <strong>IEC 60204-1:2016<\/strong>.<\/p>\n<\/li>\n<li>\n<p>Strapping-module safety documentation per <strong>EN 415-8:2008<\/strong>.<\/p>\n<\/li>\n<\/ul>\n<p>For import into Israel, confirm with the <strong>Standards Institution of Israel (SII)<\/strong> or your customs broker whether the specific machine model is subject to mandatory Israeli import certification (SI marking) or whether the manufacturer&#8217;s CE documentation is accepted. Complete this verification before shipment, not after arrival.<\/p>\n<h3>RFQ verification checklist (ten-point supplier request)<\/h3>\n<p>The buyer&#8217;s stated requirements cover the ten verification points below. Formalize them in a written RFQ:<\/p>\n<ol>\n<li>\n<p>Recommended model and full technical specification.<\/p>\n<\/li>\n<li>\n<p>Itemized quotation covering pay-off, measuring, coiling, cutting, and binding\/wrapping.<\/p>\n<\/li>\n<li>\n<p>Demonstration videos showing power cables up to 240 mm\u00b2, not only small-gauge wire.<\/p>\n<\/li>\n<li>\n<p>Maximum cable diameter and weight per meter.<\/p>\n<\/li>\n<li>\n<p>Maximum pay-off drum diameter, traverse width, and weight.<\/p>\n<\/li>\n<li>\n<p>Finished coil inner diameter, outer diameter, width, and maximum weight.<\/p>\n<\/li>\n<li>\n<p>Measuring accuracy and production speed, stated per cable cross-section.<\/p>\n<\/li>\n<li>\n<p>Electrical supply (voltage, phases, frequency) and compressed-air requirements (pressure, flow rate).<\/p>\n<\/li>\n<li>\n<p>Lead time, warranty, installation, and operator training terms.<\/p>\n<\/li>\n<li>\n<p>EXW price and delivery terms to Israel, including transport method.<\/p>\n<\/li>\n<\/ol>\n<p><strong>Two-machine fallback:<\/strong> the buyer&#8217;s stated requirement is that if no single machine covers the full cable range up to 240 mm\u00b2, the supplier must propose the most practical two-machine solution with an explicit cable-range split. This must be answered in the written proposal.<\/p>\n<h2>\u2699\ufe0f Timeline &amp; Deadlines<\/h2>\n<p><strong>No statutory or regulatory deadline applies to this equipment purchase, and the supplied materials contain no committed delivery date; the 6\u201312 week production window, 2\u20134 week shipping estimate, and 12-month warranty assumption are illustrative planning figures that become contract terms only when confirmed in the supplier&#8217;s written quotation.<\/strong><\/p>\n<table>\n<thead>\n<tr>\n<th>Stage<\/th>\n<th>Illustrative duration<\/th>\n<th>Verification required<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Supplier clarification and quotation<\/td>\n<td>1\u20132 weeks<\/td>\n<td>Supplier must commit to a response date<\/td>\n<\/tr>\n<tr>\n<td>Production after order placement<\/td>\n<td>6\u201312 weeks<\/td>\n<td>Confirm against the supplier&#8217;s current order book<\/td>\n<\/tr>\n<tr>\n<td>Shipping and customs to Israel<\/td>\n<td>2\u20134 weeks<\/td>\n<td>Depends on Incoterm, port of entry, and customs clearance<\/td>\n<\/tr>\n<tr>\n<td>Installation and operator training<\/td>\n<td>1\u20133 days on site<\/td>\n<td>Confirm whether installation is included in the price<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The buyer-stated EUR 20,000\u201330,000 budget implies a compact machine, which typically shortens build time relative to a full inline continuous line. That logic is a planning assumption, not a technical commitment.<\/p>\n<p><strong>Key request:<\/strong> the supplier must state EXW price, delivery time, and warranty in the quotation. Do not accept ranges as contract terms.<\/p>\n<h2>\ud83d\udee0\ufe0f Purchase-Decision Checklist<\/h2>\n<p><strong>Compare supplier proposals against the buyer-stated pass\/fail requirements: 240 mm\u00b2 maximum cable cross-section, 2,000 kg master drum capacity, 50 m and 100 m coil lengths, stated measuring accuracy, and a EUR 20,000\u201330,000 EXW budget assumption \u2014 each criterion must be confirmed in writing before any demonstration video is accepted as proof of capability.<\/strong><\/p>\n<ul>\n<li>\n<p>[ ] Quotation includes pay-off, measuring, coiling, cutting, and binding\/wrapping as itemized line items.<\/p>\n<\/li>\n<li>\n<p>[ ] Machine specification confirms flexible and power cables up to <strong>240 mm\u00b2<\/strong>.<\/p>\n<\/li>\n<li>\n<p>[ ] Pay-off rated for master drums up to <strong>2,000 kg<\/strong>, with drum dimensions stated.<\/p>\n<\/li>\n<li>\n<p>[ ] Coil former supports <strong>50 m and 100 m<\/strong> finished coil lengths.<\/p>\n<\/li>\n<li>\n<p>[ ] Finished coil geometry (ID, OD, width, max weight) confirmed by the supplier.<\/p>\n<\/li>\n<li>\n<p>[ ] Measuring accuracy stated as a repeatable figure, with the measurement method identified.<\/p>\n<\/li>\n<li>\n<p>[ ] Production speed stated for the largest cable size (240 mm\u00b2), not only for small-gauge wire.<\/p>\n<\/li>\n<li>\n<p>[ ] Demonstration video shows power cables, not only small wires.<\/p>\n<\/li>\n<li>\n<p>[ ] Electrical supply and compressed-air requirements listed in the quotation.<\/p>\n<\/li>\n<li>\n<p>[ ] EXW price is within the <strong>EUR 20,000\u201330,000<\/strong> buyer-stated budget assumption.<\/p>\n<\/li>\n<li>\n<p>[ ] Lead time and warranty are written into the quotation.<\/p>\n<\/li>\n<li>\n<p>[ ] If a single machine cannot cover the full cable range, a two-machine solution is proposed with explicit cable-range splits.<\/p>\n<\/li>\n<li>\n<p>[ ] Declaration of Conformity (CE) and risk-assessment documentation are available upon request.<\/p>\n<\/li>\n<\/ul>\n<h2>\ud83c\udfd7\ufe0f FAQ<\/h2>\n<h3>What is the difference between off-line and online cable packing machines?<\/h3>\n<p><strong>An offline machine works independently in the warehouse: it pulls cable from a master drum through a measuring unit, cuts to length, coils, and straps each finished coil in sequence. An online machine connects to the extrusion line through a pay-off, accumulator, and tension station, running continuously and therefore requiring the sustained volume this warehouse profile does not have.<\/strong><\/p>\n<h3>Why is PVC film used instead of PP woven sheet?<\/h3>\n<p><strong>PVC film is a transparent, flexible, low-cost wrapping material that permits visual inspection of the finished coil. PP woven sheet is a coarse polypropylene fabric with higher abrasion and puncture resistance, used for heavier protective coverings. The vendor&#8217;s Solution 2 specifies PVC film, so film grade, thickness, and protection level must be confirmed in the quotation.<\/strong><\/p>\n<h3>Can a EUR 20,000\u201330,000 budget buy a complete working line?<\/h3>\n<p><strong>The EUR 20,000\u201330,000 figure is a buyer-stated target budget, not a supplier-priced quotation. A compact offline machine can plausibly fit that range, but final cost depends on cable cross-section, coil geometry, strap-head configuration, wrapping material, and pay-off drum specification. An itemized written quotation is required to verify budget realism before negotiation begins.<\/strong><\/p>\n<h3>What happens if one machine cannot handle 240 mm\u00b2 cable?<\/h3>\n<p><strong>The equipment request included a fallback condition: if no single machine covers the full cable range up to 240 mm\u00b2, the supplier must propose the most practical two-machine solution with explicit cable-range splits. The supplied vendor response does not confirm whether that fallback was addressed, so it must be re-submitted in the formal RFQ.<\/strong><\/p>","protected":false},"excerpt":{"rendered":"<p>Verification caveat: No buyer inquiry text, supplier quotation, specification sheet, or regulatory document was available during the preparation of this guide. Every parameter labeled buyer-stated reflects the draft&#8217;s representation of the original request and must be confirmed in writing. Every delivery time, warranty period, and budget figure labeled illustrative is a planning assumption, not a [&hellip;]<\/p>","protected":false},"author":1,"featured_media":17426,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"none","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","fifu_image_url":"https:\/\/www.fhopepack.com\/blog\/wp-content\/uploads\/2018\/04\/PE-tube-Coiler-and-PU-tube-coiling-machine.jpg","fifu_image_alt":"","footnotes":""},"categories":[1256],"tags":[],"class_list":["post-17410","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-cable-coil-winding-and-strapping-machine"],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.fhopepack.com\/zh\/wp-json\/wp\/v2\/posts\/17410","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.fhopepack.com\/zh\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.fhopepack.com\/zh\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.fhopepack.com\/zh\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.fhopepack.com\/zh\/wp-json\/wp\/v2\/comments?post=17410"}],"version-history":[{"count":2,"href":"https:\/\/www.fhopepack.com\/zh\/wp-json\/wp\/v2\/posts\/17410\/revisions"}],"predecessor-version":[{"id":17427,"href":"https:\/\/www.fhopepack.com\/zh\/wp-json\/wp\/v2\/posts\/17410\/revisions\/17427"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.fhopepack.com\/zh\/wp-json\/wp\/v2\/media\/17426"}],"wp:attachment":[{"href":"https:\/\/www.fhopepack.com\/zh\/wp-json\/wp\/v2\/media?parent=17410"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.fhopepack.com\/zh\/wp-json\/wp\/v2\/categories?post=17410"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.fhopepack.com\/zh\/wp-json\/wp\/v2\/tags?post=17410"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}