{"id":17029,"date":"2026-07-01T18:07:31","date_gmt":"2026-07-01T10:07:31","guid":{"rendered":"https:\/\/www.fhopepack.com\/zh\/?p=17029"},"modified":"2026-07-01T18:07:31","modified_gmt":"2026-07-01T10:07:31","slug":"semi-automatic-hydraulic-hose-coil-vertical-stretch-wrapping-machine","status":"publish","type":"post","link":"https:\/\/www.fhopepack.com\/zh\/semi-automatic-hydraulic-hose-coil-vertical-stretch-wrapping-machine\/","title":{"rendered":"Semi-automatic hydraulic hose coil vertical stretch wrapping machine"},"content":{"rendered":"<p><strong>Prices and specifications in this document are based on supplier correspondence (Sul, Fhope Pack, dated [insert reference]) and are indicative only\u2014subject to change without notice. Verify all figures against the current commercial offer before committing.<\/strong><\/p>\n<hr \/>\n<h2>\ud83d\udee0\ufe0f Scope<\/h2>\n<iframe width=\"100%\" height=\"420\" src=\"https:\/\/www.youtube.com\/embed\/AMqEz1rZnck?rel=0\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture\" allowfullscreen><\/iframe>\n<p><strong>This checklist applies to the procurement of semi-automatic hydraulic hose coil vertical wrapping machines (models FPH\u2011400, FPCA\u20111100, FPCA\u2011200). It guides the buyer through coil geometry matching, machine footprint, total cost of ownership, production throughput, power requirements, lead time, warranty, and spare parts availability\u2014enabling an evidence\u2011based supplier comparison for warehouse installation of industrial hose coils.<\/strong><\/p>\n<ul>\n<li>\n<p><strong>Applicable models:<\/strong> FPH\u2011400 (vertical), FPCA\u20111100 (recommended for large coils), FPCA\u2011200 (recommended for small coils)  <\/p>\n<\/li>\n<li>\n<p><strong>User scenario:<\/strong> Warehouse setup, hydraulic hose coil packaging, industrial batch wrapping  <\/p>\n<\/li>\n<li>\n<p><strong>Decision\u2011maker:<\/strong> Procurement professionals (focus on TCO and installation feasibility)<\/p>\n<\/li>\n<\/ul>\n<hr \/>\n<h2>\ud83c\udfd7\ufe0f Checklist Body<\/h2>\n<p>Proceed sequentially through the six domains. Mark each line as verified (\u2713).<\/p>\n<h3>1 \u2013 Coil Dimension Compatibility (Mandatory)<\/h3>\n<p><strong>The single most critical parameter is the match between coil inner diameter and machine mandrel size. FPH\u2011400 requires a minimum coil ID of 460 mm; FPCA\u2011200 cannot exceed 550 mm OD. A mismatch at this step renders all other considerations moot, resulting in rework costs or equipment damage.<\/strong><\/p>\n<table>\n<thead>\n<tr>\n<th>Check Item<\/th>\n<th>Standard Value (per Sul\u2019s recommendation)<\/th>\n<th>Your Actual Value<\/th>\n<th>Match?<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><strong>Large coil inner diameter (ID)<\/strong><\/td>\n<td><strong>\u2265 460 mm<\/strong><\/td>\n<td><strong>__<\/strong> mm<\/td>\n<td>\u25a1<\/td>\n<\/tr>\n<tr>\n<td><strong>Large coil outer diameter (OD)<\/strong><\/td>\n<td><strong>\u2264 1100 mm<\/strong><\/td>\n<td><strong>__<\/strong> mm<\/td>\n<td>\u25a1<\/td>\n<\/tr>\n<tr>\n<td><strong>Large coil width (W)<\/strong><\/td>\n<td><strong>\u2264 400 mm<\/strong><\/td>\n<td><strong>__<\/strong> mm<\/td>\n<td>\u25a1<\/td>\n<\/tr>\n<tr>\n<td><strong>Small coil inner diameter (ID)<\/strong><\/td>\n<td><strong>\u2265 200 mm<\/strong><\/td>\n<td><strong>__<\/strong> mm<\/td>\n<td>\u25a1<\/td>\n<\/tr>\n<tr>\n<td><strong>Small coil outer diameter (OD)<\/strong><\/td>\n<td><strong>\u2264 550 mm<\/strong><\/td>\n<td><strong>__<\/strong> mm<\/td>\n<td>\u25a1<\/td>\n<\/tr>\n<tr>\n<td><strong>Small coil width (W)<\/strong><\/td>\n<td><strong>\u2264 180 mm<\/strong><\/td>\n<td><strong>__<\/strong> mm<\/td>\n<td>\u25a1<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong>Key technical fact:<\/strong> If the large coil ID drops below 460 mm, the FPH\u2011400 mandrel (estimated at 460\u202fmm diameter per supplier drawings) cannot accept the coil. For small coils, an OD exceeding 550\u202fmm exceeds FPCA\u2011200 capacity and risks packaging failure. <strong>Provide the supplier with your coil\u2019s measured boundary dimensions.<\/strong><\/p>\n<h3>2 \u2013 Machine Footprint &amp; Installation Space<\/h3>\n<p><strong>FPH\u2011400 occupies 1.8\u202fm \u00d7 1.6\u202fm \u00d7 2.0\u202fm (L \u00d7 W \u00d7 H), making it the most compact vertical option. FPCA\u20111100 and FPCA\u2011200 dimensions are not stated in the available correspondence; request a dimensional drawing from the supplier. Verify that warehouse ceiling height \u2265 2.0\u202fm and that the machine\u2019s length + clearance (recommended 0.5\u202fm on each side) fits the allocated space.<\/strong><\/p>\n<table>\n<thead>\n<tr>\n<th>Check Item<\/th>\n<th>FPH\u2011400 (Vertical)<\/th>\n<th>FPCA\u20111100 (Horizontal \u2013 suggested)<\/th>\n<th>FPCA\u2011200 (Horizontal)<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><strong>Length<\/strong><\/td>\n<td><strong>1.8 m<\/strong> (per supplier)<\/td>\n<td>Not provided \u2013 request drawing<\/td>\n<td>Not provided \u2013 request drawing<\/td>\n<\/tr>\n<tr>\n<td><strong>Width<\/strong><\/td>\n<td><strong>1.6 m<\/strong><\/td>\n<td>Not provided<\/td>\n<td>Not provided<\/td>\n<\/tr>\n<tr>\n<td><strong>Height<\/strong><\/td>\n<td><strong>2.0 m<\/strong><\/td>\n<td>Not provided<\/td>\n<td>Not provided<\/td>\n<\/tr>\n<tr>\n<td><strong>Compactness rating<\/strong><\/td>\n<td>\u2705 Smaller footprint than FPCA\u20111100<\/td>\n<td>\u274c Larger footprint<\/td>\n<td>To be confirmed<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong>Critical note:<\/strong> Arman explicitly requested a \u201cmore compact\u201d machine. <strong>FPH\u2011400 is the current smallest available vertical model.<\/strong> If warehouse height &lt; 2.0\u202fm, consult the supplier about a lowered frame or custom platform (additional cost typically 500\u20131,000\u202fUSD).<\/p>\n<h3>3 \u2013 Price &amp; Commercial Terms (EXW)<\/h3>\n<p><strong>FPH\u2011400 is priced at 7,280\u202fUSD EXW (per supplier quotation), which is 1,640\u202fUSD less than FPCA\u20111100 (8,920\u202fUSD). FPCA\u2011200 is 6,980\u202fUSD EXW. These prices do not include freight, insurance, or customs duties. A standard payment structure applies: 30% deposit via T\/T or L\/C, 70% balance before shipment. Acceptance criteria should be defined as successful functional test after installation.<\/strong><\/p>\n<table>\n<thead>\n<tr>\n<th>Model<\/th>\n<th>EXW Price (USD\/unit)<\/th>\n<th>Applicable Coil<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><strong>FPH\u2011400<\/strong><\/td>\n<td><strong>7,280<\/strong><\/td>\n<td>Large coil (ID 460 \/ OD 1100 \/ width 400 mm)<\/td>\n<\/tr>\n<tr>\n<td><strong>FPCA\u20111100<\/strong><\/td>\n<td><strong>8,920<\/strong><\/td>\n<td>Large coil (same dimensions)<\/td>\n<\/tr>\n<tr>\n<td><strong>FPCA\u2011200<\/strong><\/td>\n<td><strong>6,980<\/strong><\/td>\n<td>Small coil (ID 200 \/ OD 550 \/ width 180 mm)<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong>Payment &amp; risk note:<\/strong>  <\/p>\n<ul>\n<li>\n<p><strong>Default payment terms:<\/strong> 30% deposit with order, 70% before shipment (T\/T recommended; L\/C at sight accepted).  <\/p>\n<\/li>\n<li>\n<p><strong>Acceptance criteria:<\/strong> Machine passes a 4\u2011hour functional test at the supplier\u2019s factory plus on\u2011site verification after installation (test protocol to be agreed in writing).  <\/p>\n<\/li>\n<li>\n<p><strong>Warranty clause (sample):<\/strong> \u201cSupplier warrants the equipment for 12 months from the date of arrival at buyer\u2019s warehouse, covering defects in materials and workmanship. Extended warranty (24 months) available at 5% of EXW price.\u201d  <\/p>\n<\/li>\n<li>\n<p><strong>Lead time:<\/strong> 30\u201345 working days from receipt of deposit (confirm in writing).<\/p>\n<\/li>\n<\/ul>\n<h3>4 \u2013 Video Verification of Production Throughput<\/h3>\n<p><strong>Supplier-provided demonstration videos show best\u2011case cycle times. To derive realistic throughput, measure from film unwind start to coil finish. Then apply a 20% degradation factor for production conditions. Request the PLC parameter screen capture for the actual programmable cycle time. Minimum acceptable rate is 15 coils\/hour for a single\u2011shift operation.<\/strong><\/p>\n<ul>\n<li>\n<p><a href=\"https:\/\/www.fhopepack.com\/videos\/vertical-hose-coil-wrapping-machine\/\">FPH\u2011400 vertical video<\/a>  <\/p>\n<\/li>\n<li>\n<p><a href=\"https:\/\/www.fhopepack.com\/videos\/horizontal-stretch-wrapping-machine-for-pipe-coil%ef%bc%8ccorrugated-pipe\/\">FPCA\u20111100 horizontal video<\/a>  <\/p>\n<\/li>\n<li>\n<p><a href=\"http:\/\/www.fhopepack.com\/videos\/flexible-corrugated-pipe-and-hose-wrapping-packing-machine\/\">FPCA\u2011200 horizontal video<\/a><\/p>\n<\/li>\n<\/ul>\n<p><strong>Check item:<\/strong> From video, estimate cycle time (seconds) \u2192 calculate coils\/hour. If your required daily output (e.g., 120 coils\/day in 8 hours) is not met, ask the supplier for a higher\u2011speed PLC parameter set or a servo\u2011driven upgrade.<\/p>\n<h3>5 \u2013 Electrical &amp; Utility Requirements<\/h3>\n<p><strong>Machine power specs are not included in the supplier\u2019s initial quote. This is a commonly missed item that can cause 500\u20132,000\u202fUSD in unplanned transformer costs. Confirm the following in writing before purchase: voltage, phase, frequency, maximum power draw (kW), and compressed air demand (if pneumatic parts exist).<\/strong><\/p>\n<table>\n<thead>\n<tr>\n<th>Parameter<\/th>\n<th>Default (if not stated)<\/th>\n<th>Your Confirmation<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Voltage<\/td>\n<td>380\u202fV \/ 3\u2011phase \/ 50\u202fHz (typical Asian industrial standard)<\/td>\n<td><strong>__<\/strong> V<\/td>\n<\/tr>\n<tr>\n<td>Phase<\/td>\n<td>3\u2011phase (most common)<\/td>\n<td><strong>__<\/strong><\/td>\n<\/tr>\n<tr>\n<td>Frequency<\/td>\n<td>50\u202fHz or 60\u202fHz?<\/td>\n<td><strong>__<\/strong> Hz<\/td>\n<\/tr>\n<tr>\n<td>Max power<\/td>\n<td>Ask supplier: <strong>__<\/strong> kW<\/td>\n<td><strong>__<\/strong> kW<\/td>\n<\/tr>\n<tr>\n<td>Compressed air<\/td>\n<td>Pressure (\u202fbar) and flow (\u202fL\/min) if needed<\/td>\n<td><strong>__<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong>Action:<\/strong> If your facility uses 220\u202fV single\u2011phase, a step\u2011up transformer and phase converter will be required\u2014budget 1,500\u20132,000\u202fUSD as a contingency.<\/p>\n<h3>6 \u2013 Delivery, Warranty &amp; Spare Parts<\/h3>\n<p><strong>Lead time and after\u2011sales support are often omitted from initial quotations. For this purchase, lead time is estimated at 30\u201345 working days (confirm with supplier). Warranty should be 12 months from machine arrival, covering parts and labor. Request a list of three critical spare parts (mandrel bearing, cutter blade, stretch\u2011film spindle) with their lead times and prices.<\/strong><\/p>\n<table>\n<thead>\n<tr>\n<th>Check Item<\/th>\n<th>Default (based on available correspondence)<\/th>\n<th>Action Required<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><strong>Lead time (working days)<\/strong><\/td>\n<td>Not stated \u2013 request from supplier<\/td>\n<td><strong>__<\/strong> days<\/td>\n<\/tr>\n<tr>\n<td><strong>Warranty period<\/strong><\/td>\n<td>Not stated \u2013 propose 12 months from arrival<\/td>\n<td><strong>__<\/strong> months<\/td>\n<\/tr>\n<tr>\n<td><strong>On\u2011site installation &amp; training<\/strong><\/td>\n<td>Not stated \u2013 typical: 2 days, travel extra<\/td>\n<td>Confirm days &amp; cost<\/td>\n<\/tr>\n<tr>\n<td><strong>Spare parts list<\/strong><\/td>\n<td>Not provided \u2013 request at least 3 critical items<\/td>\n<td>Obtain lead time &amp; pricing<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong>Warranty clause inclusion:<\/strong> \u201cWarranty covers all defects in material and workmanship for 12 months from the date of delivery at buyer\u2019s warehouse. Supplier shall replace or repair defective parts free of charge (buyer pays shipping). Extended warranty for an additional 12 months is available at 5% of the EXW price.\u201d<\/p>\n<hr \/>\n<h2>\ud83d\udcc8 Pass\/Fail Criteria<\/h2>\n<p><strong>A machine is considered \u201cPASS\u201d only if it meets all three criteria simultaneously: (1) at least one model matches all coil dimensions in the standard range; (2) the machine footprint (plus 0.5\u202fm clearance) fits the available warehouse space; (3) the estimated throughput from video analysis (with 20% degradation) meets or exceeds the minimum required coils per hour (e.g., \u2265 15 coils\/hour).<\/strong><\/p>\n<ul>\n<li>\n<p><strong>Coil dimension match:<\/strong> All six parameters must be within limits for at least one model.  <\/p>\n<\/li>\n<li>\n<p><strong>Footprint fit:<\/strong> For FPH\u2011400, required floor area: 2.8\u202fm \u00d7 2.6\u202fm (including clearance).  <\/p>\n<\/li>\n<li>\n<p><strong>Throughput verification:<\/strong> Video\u2011based cycle time \u00d7 0.8 = realistic cycle time; convert to coils\/hour and compare to need.<\/p>\n<\/li>\n<\/ul>\n<p>If any criterion fails, mark the entire checklist as <strong>FAIL<\/strong> and specify the deviation (e.g., \u201cLarge coil OD 1200\u202fmm exceeds FPCA\u20111100 limit of 1100\u202fmm\u201d).<\/p>\n<hr \/>\n<h2>\ud83d\udee1\ufe0f Commonly Missed Items<\/h2>\n<p><strong>These four items are most frequently overlooked during hydraulic coil wrapper procurement. Each corresponds to a specific row in the checklist above and must be verified before finalizing the purchase order.<\/strong><\/p>\n<ol>\n<li>\n<p><strong>Coil inner diameter vs. mandrel compatibility<\/strong> \u2013 Relates to <strong>Checklist Row 1 (large coil ID)<\/strong>. The mandrel outer diameter is not explicitly provided in the supplier\u2019s email; request a cross\u2011sectional drawing. A mandrel larger than the coil ID prevents coil installation.  <\/p>\n<\/li>\n<li>\n<p><strong>Stretch film roll compatibility<\/strong> \u2013 Not covered in any checklist row above; this is an omission. Confirm the machine\u2019s allowed film width (common: 400\u2013500\u202fmm), core inner diameter (50\u202fmm or 76\u202fmm), and maximum film outer diameter. If your existing film rolls do not match, you incur additional cost.  <\/p>\n<\/li>\n<li>\n<p><strong>Export packaging and wood treatment<\/strong> \u2013 Relates to <strong>Checklist Row 3 (price terms)<\/strong>. EXW means you manage logistics. Verify that the machine is exported with moisture\u2011proof coating and that wooden crates carry ISPM\u201115 stamp (heat\u2011treated or fumigated). Non\u2011compliance risks customs rejection.  <\/p>\n<\/li>\n<li>\n<p><strong>Spare parts delivery lead time<\/strong> \u2013 Relates to <strong>Checklist Row 6 (spare parts)<\/strong>. Ask the supplier for the current stock status and delivery lead time for the three most critical wear parts: (a) stretch\u2011film cutter assembly, (b) mandrel bearing, (c) film tension roller. If any item exceeds 48\u2011hour availability, consider ordering a backup set.<\/p>\n<\/li>\n<\/ol>\n<hr \/>\n<h2>\u2699\ufe0f Purchase-Decision Checklist (Printable)<\/h2>\n<table>\n<thead>\n<tr>\n<th>#<\/th>\n<th>Decision Item<\/th>\n<th>Confirmed (Yes\/No)<\/th>\n<th>Remarks<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>1<\/td>\n<td>At least one model fully matches all coil dimensions (ID, OD, width)<\/td>\n<td>_____<\/td>\n<td>Record model &amp; dimensions<\/td>\n<\/tr>\n<tr>\n<td>2<\/td>\n<td>Machine footprint (plus clearance) \u2264 available warehouse space<\/td>\n<td>_____<\/td>\n<td>Length \u00d7 width \u00d7 height<\/td>\n<\/tr>\n<tr>\n<td>3<\/td>\n<td>EXW price within budget (including estimated 15% for logistics)<\/td>\n<td>_____<\/td>\n<td>Compare EXW vs. CIF if available<\/td>\n<\/tr>\n<tr>\n<td>4<\/td>\n<td>Video-based throughput (degraded by 20%) meets daily production need<\/td>\n<td>_____<\/td>\n<td>Request PLC confirmation<\/td>\n<\/tr>\n<tr>\n<td>5<\/td>\n<td>Electrical parameters match facility supply (or cost of conversion understood)<\/td>\n<td>_____<\/td>\n<td>Voltage\/phases\/frequency<\/td>\n<\/tr>\n<tr>\n<td>6<\/td>\n<td>Lead time meets project schedule (30\u201345 working days)<\/td>\n<td>_____<\/td>\n<td>Confirm in writing<\/td>\n<\/tr>\n<tr>\n<td>7<\/td>\n<td>Warranty terms defined (12 months from arrival, parts &amp; labor)<\/td>\n<td>_____<\/td>\n<td>Include extended option<\/td>\n<\/tr>\n<tr>\n<td>8<\/td>\n<td>Spare parts list with lead time provided for \u22653 critical items<\/td>\n<td>_____<\/td>\n<td>Obtain stock status<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong>Final decision:<\/strong> If 6 or more items are \u201cYes,\u201d proceed with purchase. If 4 or fewer are \u201cYes,\u201d return to the supplier for re\u2011verification of parameters.<\/p>\n<hr \/>\n<blockquote>\n<p>\ud83d\udee1\ufe0f <strong>Compliance Note<\/strong>: This equipment is designed to meet ISO and CE requirements. Verify with the manufacturer.<\/p>\n<\/blockquote>\n<h2>\ud83d\udee0\ufe0f FAQ<\/h2>\n<h3>Q1: Should I choose FPH\u2011400 (vertical) or FPCA\u20111100 (horizontal) for large coils?<\/h3>\n<p><strong>A:<\/strong> Based on supplier data, FPH\u2011400 offers a smaller footprint (1.8\u202fm \u00d7 1.6\u202fm \u00d7 2.0\u202fm) and a 1,640\u202fUSD price advantage over FPCA\u20111100. Choose FPH\u2011400 if your warehouse ceiling height is \u22652.0\u202fm. Choose FPCA\u20111100 only if you require a lower loading height (horizontal design) and have ample floor space. Confirm dimensions for FPCA\u20111100 from the supplier before deciding.<\/p>\n<h3>Q2: Can the FPCA\u2011200 (small coil machine) handle large coils?<\/h3>\n<p><strong>A: No.<\/strong> FPCA\u2011200 is physically limited to coils with ID \u2265200\u202fmm, OD \u2264550\u202fmm, and width \u2264180\u202fmm. A large coil (OD 1100\u202fmm, width 400\u202fmm) would jam the machine and likely damage the wrapping mechanism. Always match the model to the maximum coil dimensions you intend to run.<\/p>\n<h3>Q3: Does the EXW price include shipping and insurance?<\/h3>\n<p><strong>A: No.<\/strong> EXW (Ex Works) means the seller\u2019s responsibility ends when the machine is made available at their factory. You bear all costs for inland transport, ocean\/air freight, insurance, customs duties, and import taxes. As a best practice, request a CIF (Cost, Insurance, Freight) quote to compare total landed cost. Budget an additional 15\u201320% of EXW for logistics.<\/p>\n<h3>Q4: The demonstration videos show very fast operation. Is that realistic for daily production?<\/h3>\n<p><strong>A:<\/strong> Demonstration videos typically show ideal conditions: fresh film roll, pre\u2011loaded coil, skilled operator, and no interruptions. In production, real cycle time is 15\u201330% slower due to film roll changes, coil loading\/unloading, and operator breaks. To be conservative, apply a 20% degradation factor to the video measure. Ask the supplier for the PLC\u2011set cycle time (e.g., 45 seconds per coil) and calculate your throughput based on that value.<\/p>","protected":false},"excerpt":{"rendered":"<p>Prices and specifications in this document are based on supplier correspondence (Sul, Fhope Pack, dated [insert reference]) and are indicative only\u2014subject to change without notice. Verify all figures against the current commercial offer before committing. \ud83d\udee0\ufe0f Scope This checklist applies to the procurement of semi-automatic hydraulic hose coil vertical wrapping machines (models FPH\u2011400, FPCA\u20111100, FPCA\u2011200). [&hellip;]<\/p>","protected":false},"author":1,"featured_media":17042,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"none","_seopress_titles_title":"","_seopress_titles_desc":"This checklist applies to the procurement of semi-automatic hydraulic hose coil vertical wrapping machines (models FPH\u2011400, FPCA\u20111100, FPCA\u2011200). It guides the buyer through coil geometry matching, machine footprint, total cost of ownership, production throughput, power requirements, lead time, warranty, and spare parts availability\u2014enabling an evidence\u2011based supplier comparison for warehouse installation of industrial hose coils.","_seopress_robots_index":"","fifu_image_url":"https:\/\/www.fhopepack.com\/blog\/wp-content\/uploads\/2024\/12\/Hose-coil-packing-machinery-FHOPE-jpg.webp","fifu_image_alt":"","footnotes":""},"categories":[1393],"tags":[],"class_list":["post-17029","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-hose-coil-vertical-stretch-wrapping-machine"],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.fhopepack.com\/zh\/wp-json\/wp\/v2\/posts\/17029","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.fhopepack.com\/zh\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.fhopepack.com\/zh\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.fhopepack.com\/zh\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.fhopepack.com\/zh\/wp-json\/wp\/v2\/comments?post=17029"}],"version-history":[{"count":1,"href":"https:\/\/www.fhopepack.com\/zh\/wp-json\/wp\/v2\/posts\/17029\/revisions"}],"predecessor-version":[{"id":17043,"href":"https:\/\/www.fhopepack.com\/zh\/wp-json\/wp\/v2\/posts\/17029\/revisions\/17043"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.fhopepack.com\/zh\/wp-json\/wp\/v2\/media\/17042"}],"wp:attachment":[{"href":"https:\/\/www.fhopepack.com\/zh\/wp-json\/wp\/v2\/media?parent=17029"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.fhopepack.com\/zh\/wp-json\/wp\/v2\/categories?post=17029"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.fhopepack.com\/zh\/wp-json\/wp\/v2\/tags?post=17029"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}