Delivery, Installation and Commissioning: What a Turnkey Project Includes
Delivery, Installation and Commissioning: What a Turnkey Project Includes
A turnkey project only works if both sides know where the supplier's scope ends and the customer's begins. Here is what our turnkey dây chuyền đóng gói cuộn dây tự động projects include and what the customer usually prepares.
Equipment and Controls
- All line stations in the agreed configuration, for example turnstile, down-ender, conveyors, wrapper, strapping, weighing and labeling, and stacking
- Switch gear and isolation transformer, and control hardware housed in our panels
- Field wiring with push-button stations, terminal boxes and junction boxes
- Field sensors (proximity and limit switches) and solenoids
- Main components from named brands: Siemens PLC and frequency converters, Autonics sensors and Schneider switches; the HMI touch screen is chosen per project from Mitsubishi, Siemens, MCGS or Delta
The image shows an online slit coil packing line turnkey project. The turnkey scope covers all line stations in the agreed configuration, plus the switch gear, control hardware, field wiring and sensors.
Tài liệu kỹ thuật
- CAD wiring diagram, terminal diagram and control panel diagram
- PLC program (Siemens STEP7)
- Danh sách phụ tùng
Phụ tùng và dụng cụ
- A starting set of spare parts, for example bearings, panel switches, fuses and breakers
- A tool box with a set of tools
Giao hàng tận nơi
- Standard export packing, or FCL containers for larger lines
- Typical delivery after down payment: about 90 days for a compact line, about 120 days for larger eye-through wrapping systems, and about 150 days for radial strapping machines
- Switch cabinets: about 800 mm wide on small standalone machines and 1200–1600 mm on medium machines; on large lines the cabinet system is split into transport units no wider than 3600 mm
Nghiệm thu tại nhà máy và công trường
- MẬP: after building, we run and debug the machine in our factory, and you inspect it there. Alternatively, you can accept the machine remotely: we test-run it and send inspection videos and photos.
- NGỒI: after installation and commissioning, you run the machine on site for acceptance.
The image shows a strip automated packing line with a person checking the equipment during the project phase. Factory acceptance includes a full test-run and inspection before shipment.
Lắp đặt và Vận hành
Our engineers install and commission the line on site. Typical durations are 1–2 days for small machines, about 1 week for customized machines, 10–15 days for large customized machines, and about 30 days for a large complete project. On larger projects, we also supervise erection and support the performance tests.
The image shows a strip automated packing line installed in a plant. Our engineers install and commission the line on site, from 1–2 days for small machines to about 30 days for a large complete project.
Watch a fully automatic steel strip coil packaging line complete process:
Hội thảo
We train the operators and maintenance staff during commissioning: 1–3 days as standard, and 3 days for automatic lines. For extra support during the first production runs, you can buy a production-accompaniment service package.
After Handover
- 2 năm bảo hành
- Hỗ trợ kỹ thuật trọn đời
Typical Customer Scope
| Mục | Khách hàng |
|---|---|
| Foundations, pits and civil works (based on our concept drawings) | ✔ |
| Power and compressed air to the agreed take-over points | ✔ |
| Lifting equipment during installation | ✔ |
| Packaging consumables (film, paper, strap, edge protectors) | ✔ |
Engineer travel costs are agreed between both parties, usually as fixed terms in the quotation.
FAQ
Does a turnkey project include installation? Yes. Our engineers install and commission the line.
Which documents do we receive? CAD wiring, terminal and panel diagrams, the Siemens STEP7 PLC program, and the spare parts list.
Những gì không bao gồm? Customer scope usually covers the civil works, the utilities up to the take-over points, lifting equipment during installation, and the packaging consumables. Engineer travel costs are agreed in the quotation, usually as fixed terms.
Chế độ bảo hành nào được áp dụng? A 2-year warranty and lifetime technical support.
Ask for a scope-of-supply list for your dây chuyền đóng gói cuộn dây tự động, hoặc là liên hệ với chúng tôi.
Chi tiết hình ảnh
Nhấn vào đây để phóng to
Nhấn vào đây để phóng to
Nhấn vào đây để phóng to
Nhấn vào đây để phóng to
Xem cách nó hoạt động
Khám phá cách các giải pháp đóng gói tự động của chúng tôi tối ưu hóa hiệu quả dây chuyền sản xuất của bạn. Video này minh họa hoạt động liền mạch được thiết kế để bảo vệ sản phẩm tối đa.
Được tin cậy bởi Các nhà máy thép và các nhà lãnh đạo ngành công nghiệp
Các nhà sản xuất toàn cầu tin dùng thiết bị đóng gói hạng nặng của FHOPE.
Bạn đã sẵn sàng tối ưu hóa dây chuyền đóng gói của mình chưa?
Nhận báo giá tùy chỉnh kèm phân tích lợi tức đầu tư (ROI). Kỹ sư của chúng tôi sẽ phản hồi trong vòng 24 giờ.
- Thiết kế bố cục miễn phí
- Hỗ trợ lắp đặt toàn cầu
- Bao gồm bảo hành 2 năm
Thông tin của bạn được bảo mật và sẽ không bao giờ được chia sẻ.