> **Rezumat executiv**
> This clip runs through several of our coil packing lines. It shows a copper coil strapped on a turntable, eye-through wrappers on roller conveyors, a tilter, flat coils wrapped under a gantry ring, and gantries stacking the finished coils. Each station replaces a manual job on the shop floor, so we pick the stations per plant from the coil size and output.
Cuprins
- Ce arată clipul
- Ce înlocuiește fiecare stație
- Muncă pe schimb
- Cum alegem stațiile
- Listă de verificare a selecției
- Siguranţă
- Întrebări frecvente despre inginerie
- Urmatorul pas
- Citire conexă
- Surse
Ce arată clipul
| Pas | Ceea ce vezi |
|---|---|
| Strapping | A copper coil strapped on a turntable |
| Eye-through wrapping | Blue orbital wrappers wrap coils on roller conveyors |
| Tilting | A tilter turns a coil on the line |
| Flat coil wrapping | Large flat coils wrapped under a gantry ring |
| Stacking | Gantries lift and stack finished coils |
Ce înlocuiește fiecare stație
| Station | Manual job it replaces |
|---|---|
| Strapping | Hand strapping with a tool |
| Eye-through wrapping | Hand wrapping film through the eye |
| Tilting | Turning coils with a crane |
| Flat coil wrapping | Hand wrapping large coils on the pallet |
| Stacking | Crane or forklift stacking |
Muncă pe schimb
**Exemplu lucrat (ilustrativ).**
| Articol | Valoare |
|---|---|
| Manual packing crew per shift (illustrative) | 6 people |
| Crew with the automatic line (illustrative) | 2 people |
| People moved to other work, 6 − 2 | 4 per shift |
| Shifts per day (illustrative) | 2 |
| People moved per day, 4 × 2 | 8 |
| Shift length (illustrative) | 8 h |
| Labour hours moved per day, 8 × 8 | 64 h |
Cum alegem stațiile
| Choice | Depends on |
|---|---|
| Strapping | Radial, circumferential or both |
| Wrapping | Eye-through or flat coil ring |
| Tilting | Coil position from the slitter or mill |
| Stacking | Gantry or robot, stack pattern |
Listă de verificare a selecției
- [ ] Coil sizes, weights and materials.
- [ ] Bobine pe oră.
- [ ] Current manual jobs and crew.
- [ ] Strapping and wrapping needed.
- [ ] Tilting needed.
- [ ] Stacking pattern.
Siguranţă
- Keep clear of each station while it runs.
- Stay outside fenced gantry and robot areas.
- Lock out before clearing any jam.
- Pentru piețele CE, mașina este proiectată conform standardelor ISO 12100 și EN 415-10.
Întrebări frecvente despre inginerie
Q: Which stations does a coil packing line have?
A: Strapping, wrapping, tilting and stacking, chosen per plant.
Q: What does each station replace?
A: Hand strapping, hand wrapping, crane tilting and crane or forklift stacking.
Q: How many people does it free?
A: 4 people per shift in the worked example, 8 a day over 2 shifts.
Q: Gantry or robot stacking?
A: We choose by coil weight, coil size, cycle rate and stack pattern.
Q: Can stations be added later?
A: Yes. We plan space for stations added later.
Î: Ce standarde se aplică?
R: Pentru piețele CE, ISO 12100 și EN 415-10.
Urmatorul pas
Punem la punct o linie de ambalare a bobinelor în trei etape:
1. **Submit your layout drawing** with coil sizes, weights, output and current crew, to **info@fhopepack.com**.
2. **Primiți o propunere în termen de 48 de ore** cu datele mașinii și macheta.
3. **Book a site survey** so we confirm the floor layout.
Citire conexă
- [Steel Coil Packaging Line: Five ROI Metrics](https://www.fhopepack.com/videos/5-critical-roi-metrics-to-evaluate-a-full-steel-coil-packaging-line-from-strapping-to-stacking-automation/)
- [Steel Coil Strapping, Labelling and Stacking Line](https://www.fhopepack.com/videos/4-core-packaging-kpis-how-steel-coil-strapping-wrapping-lines-lower-tco-and-cut-transit-damage-by-90/)
- [Slit Coil Tilting, Wrapping and Stacking Line](https://www.fhopepack.com/videos/mechanical-load-and-tension-analysis-in-integrated-tilting-strapping-and-stretch-wrapping-systems-for-high-precision-slit-steel-coil/)
- [Automatic coil packing lines](https://www.fhopepack.com/Automatic-Coil-Packing-Line/)
Surse
- Conținutul mașinii: echipa de ingineri FHOPE, 04.10.2026
- Clip: [the video on YouTube](https://www.youtube.com/watch?v=tAIQjo7LNb8)
- Labour per shift: our worked example, illustrative values
- Domeniul standardelor: ISO 12100:2010; [EN 415-10:2014](https://www.nen.nl/en/nen-en-415-10-2014-en-191845)
- Termenul propunerii: apel la apel aprobat de către proprietar (propunere în termen de 48 de ore)
Ultima recenzie: 21.09.2026