Automatic Cable Wire Coiling, Strapping and Shrink Packaging Machine

Santrauka Cable sold by the coil has to arrive with an exact length, tied turns and a clean cover, so cable plants coil, strap and shrink-wrap in one line. Our line does all three: a coiler with red feed rollers winds green cable on a mandrel, a yellow strapping head ties the coil, and a shrink tunnel heats the film tight around it. Turns and film size follow from the Kabelio ilgis ir ritės dydis. All are set per project.

Šiame puslapyje: Ką rodo vaizdo įrašas · How the coiling, strapping and shrink line works · Apsisukimų skaičius ritėje · Shrink film size · Valdikliai ir sauga · Selection checklist for a cable coiling and packing line · Inžinerijos DUK · Kitas žingsnis · Susijęs skaitymas · Šaltiniai

Ką rodo vaizdo įrašas

Green cable runs from a spool through red feed rollers into the coiler, beside a blue cabinet and silver control panel. The cable winds onto a turning mandrel as the coiling head moves across to lay tight turns.

The finished coil moves to the yellow strapping station, where a strap goes round it. It then runs on a conveyor into a long shrink tunnel, where the clear film on the coil is heated tight, and the packed coil leaves on the conveyor. Yellow fencing encloses the line.

How the coiling, strapping and shrink line works

Stotis Ką ji daro
Coiler Feeds cable through the rollers and winds it on the mandrel
Perkelti Moves the coil off the mandrel
augalotas Ties the coil so the turns hold
Susitraukimo tunelis Heats film tight around the coil
Išsiurbti Carries the packed coil out

Strapping before shrinking holds the turns, so the film shrinks onto a coil that keeps its shape. For coils covered with stretch film instead, see our economic cable coil packing machine.

Apsisukimų skaičius ritėje

Turns follow from the cable length and the mean coil diameter. Illustrative example for a 100 m coil:

Punktas Reikšmė
Coil ID (illustrative) 180 mm
Coil OD (illustrative) 260 mm
Mean diameter, (180 + 260) ÷ 2 220 mm
Length per turn, π × 0.22 m apie 0.69 m
Turns, 100 ÷ 0.69 apie 145

The coiler counts length, not turns, so the coil length stays exact even if the diameter varies a little.

Shrink film size

The film has to cover the coil face to face with enough to close. Illustrative example for the same 260 mm OD coil, 100 mm high:

Punktas Reikšmė
ritė OT 260 mm
Coil height (illustrative) 100 mm
Closing allowance each side (illustrative) 30 mm
Plėvelės plotis, 260 + 100 + 2 × 30 420 mm

Taller coils need wider film. We set the film size from your largest coil.

Valdikliai ir sauga

The mandrel, strapping head and shrink tunnel run inside the yellow fence, and the tunnel is hot. Keep people outside the fence while the line runs, and clear jams only with the station stopped.

Taikomi standartai priklauso nuo paskirties rinkos. CE rinkoms ISO 12100 nustato rizikos vertinimo metodą, o EN 415-10 nustato bendruosius pakavimo mašinų reikalavimus.

Selection checklist for a cable coiling and packing line

  • Cable diameter and type.
  • Coil length, ID, OD and height.
  • Ritės per valandą.
  • Straps per coil.
  • Shrink film type and thickness.
  • Grindų plotas ir maitinimo šaltinis.

Inžinerijos DUK

Q: Why strap before shrink-wrapping? A: So the turns hold and the film shrinks onto a coil that keeps its shape.

Q: How does coil size affect the number of turns? A: Turns = length ÷ (π × mean diameter). A 100 m coil at a 220 mm mean diameter has about 145 in our example.

Q: How wide should the shrink film be? A: Coil OD plus height plus closing allowance. Our 260 mm OD, 100 mm high coil needs about 420 mm.

Q: Does the coiler count turns or length? A: Length, so the coil length stays exact.

Q: Is the line guarded? A: Yes. Yellow fencing encloses the line.

Kitas žingsnis

We plan your cable coiling and packing line in three steps:

  1. Pateikite savo išdėstymo brėžinį with cable sizes, coil lengths and output to info@fhopepack.com.
  2. Gaukite pasiūlymą per 48 valandas, with the coil, strap and film plan.
  3. Užsisakykite objekto apžiūrą patikrinti linijų išdėstymą ir grindų plotą.

Šaltiniai

Paskutinį kartą peržiūrėta: 2026-10-04