תקציר מנהלים This clip runs through several of our coil packing lines. It shows a copper coil strapped on a turntable, eye-through wrappers on roller conveyors, a tilter, flat coils wrapped under a gantry ring, and gantries stacking the finished coils. Each station replaces a manual job on the shop floor, so we pick the stations per plant from the coil size and output.
תוכן העניינים
- מה שהקליפ מראה
- What each station replaces
- עבודה למשמרת
- How we choose the stations
- רשימת בדיקה לבחירה
- בְּטִיחוּת
- שאלות נפוצות בנושא הנדסה
- שלב הבא
- קריאה קשורה
- מקורות
מה שהקליפ מראה
| שלב | מה אתה רואה |
|---|---|
| חָסוּן וְגָבוֹהָ | A copper coil strapped on a turntable |
| עטיפת עין | Blue orbital wrappers wrap coils on roller conveyors |
| הטיה | A tilter turns a coil on the line |
| Flat coil wrapping | Large flat coils wrapped under a gantry ring |
| הערמה | Gantries lift and stack finished coils |
What each station replaces
| תַחֲנָה | Manual job it replaces |
|---|---|
| חָסוּן וְגָבוֹהָ | Hand strapping with a tool |
| עטיפת עין | Hand wrapping film through the eye |
| הטיה | Turning coils with a crane |
| Flat coil wrapping | Hand wrapping large coils on the pallet |
| הערמה | ערימה באמצעות מנוף או מלגזה |
עבודה למשמרת
דוגמה מעשית (להמחשה).
| פריט | ערך |
|---|---|
| Manual packing crew per shift (illustrative) | 6 אנשים |
| Crew with the automatic line (illustrative) | 2 אנשים |
| People moved to other work, 6 − 2 | 4 לכל משמרת |
| Shifts per day (illustrative) | 2 |
| People moved per day, 4 × 2 | 8 |
| אורך משמרת (לדוגמה) | 8 h |
| Labour hours moved per day, 8 × 8 | 64 h |
How we choose the stations
| בחירה | תלוי ב |
|---|---|
| חָסוּן וְגָבוֹהָ | Radial, circumferential or both |
| גלישה | Eye-through or flat coil ring |
| הטיה | Coil position from the slitter or mill |
| הערמה | Gantry or robot, stack pattern |
רשימת בדיקה לבחירה
- Coil sizes, weights and materials.
- סלילים לשעה.
- Current manual jobs and crew.
- Strapping and wrapping needed.
- Tilting needed.
- Stacking pattern.
בְּטִיחוּת
- Keep clear of each station while it runs.
- Stay outside fenced gantry and robot areas.
- Lock out before clearing any jam.
- עבור שווקי CE, המכונה מתוכננת לפי תקני ISO 12100 ו-EN 415-10.
שאלות נפוצות בנושא הנדסה
Q: Which stations does a coil packing line have? A: Strapping, wrapping, tilting and stacking, chosen per plant.
Q: What does each station replace? A: Hand strapping, hand wrapping, crane tilting and crane or forklift stacking.
Q: How many people does it free? A: 4 people per shift in the worked example, 8 a day over 2 shifts.
Q: Gantry or robot stacking? A: We choose by coil weight, coil size, cycle rate and stack pattern.
Q: Can stations be added later? A: Yes. We plan space for stations added later.
ש: אילו תקנים חלים? ת: עבור שווקי CE, ISO 12100 ו-EN 415-10.
שלב הבא
We match a coil packing line in three steps:
- שלח את שרטוט הפריסה שלך with coil sizes, weights, output and current crew, to info@fhopepack.com.
- קבלו הצעה תוך 48 שעות עם נתוני המכונה והפריסה.
- הזמן סקר באתר אז אנחנו מאשרים את סידור הקומה.
קריאה קשורה
- קו אריזת סלילי פלדה: חמישה מדדי החזר השקעה
- קו חיזוק, תיוג וערימה של סלילי פלדה
- Slit Coil Tilting, Wrapping and Stacking Line
- קווי אריזה אוטומטיים של סלילים
מקורות
- תוכן המכונה: צוות ההנדסה של FHOPE, 4.10.2026
- קליפ: הסרטון ביוטיוב
- Labour per shift: our worked example, illustrative values
- היקף התקנים: ISO 12100:2010; EN 415-10: 2014
- מועד הגשת ההצעה: אישור קריאה לפעולה (הצעה תוך 48 שעות)
נבדק לאחרונה: 10-10-2026