orbital stretch wrapper for pump motor and gear

orbital stretch wrapper for motor and gear
orbital stretch wrapper for motor,pump and gear

 

Explanation of solution 1:

Step 1: To strap the pump by horizontal strapping machine;

Step 2: To convey the pumpl into its wrapping position in orbital stretch wrapper, and start to wrap it by horizontal wrapping machine;

Step 3: To convey the wrapped coil into its stacking position, and stack them layer by layer into one big coil package;

Step 4: To strap the big coil package by horizontal strapping machine.

 

Note: All online process- the eye of the coil is vertical.

Explanation of solution 2:

Step 1: To strap the wire coil by horizontal strapping machine;

Step 2: Convey the coil to the coil tilter;

Step 3: To turn over the coil from horizontality into verticality;

Step 3: To lift the vertically strapped wire coil into a trolley by coil tilter;

Step 4: To move the vertical coil into its wrapping station by trolley;

Step 5: To wrap the vertical coil with packing material by vertical wrapping machine;

Step 6: To lift the vertically wrapped pump into its stacking position to be a big vertical big coil package by coil lifter;

Step7: To strap the whole big vertical coil by vertical strapping machine.

 

Note: The eye of the coil for the first time strapping is vertical. After turning over, the following processes need the eye of the coil is horizontal.

 

Automatic hose coiler and coiling machine to connect with extruder for online handling.

Comments are closed. Posted by: stretchwrapping on

Tags: , ,